Skip to main content

Posts

Showing posts from June 16, 2013

Neconde Energy Limited Recruits Experienced Engineers into Various Positions, Click to View more Details to Apply

Neconde Started Operations Officially in December 2011.The Company currently is in a joint venture with NPDC (Nigerian Petroleum Development Company) on OML 42. This Oil Property was acquired from SPDC(Shell Petroleum Development Company) in November 2011 as a result of the Local Content Act signed into law in April 2010. OML 42 is a 814 square kilometer lease originally awarded in 1962. Initial production commenced in 1969 and aggregate production from the 5 fields discovered within OML 42 reached a peak of approximately 250,000 barrels of oil equivalent per day (“boe/d”) in the 1970’s. Production, which was primarily oil, continued until the first part of 2005 when the producing fields were shut-in due to security issues in the Niger Delta area. Production at the time of the shut-in was more than 50,000 barrels of oil per day (“bopd”) and more than 80 million cubic feet per day (“MMcf/d”) of natural gas.